Kaiser Permanente Renovation, Hollywood, CA

Kaiser.jpg

Client: Kaiser Foundation Health Plan, of Southern California, Inc.

Prime Contractor: Rudolf and Sletten

Project Location: Hollywood, CA

TEC Services

  • General Contractor

Project Details

  • Construction Value: $410M

  • Completed: 2008

This 1,000,000 sf facility consisted of the phased demolition and reconstruction of Kaiser’s Los Angeles Medical Center. The delivery of the project required the execution of 16 separate bid packages to rebuild the existing primary care medical center campus with minimal disruptions to ongoing healthcare operations. The rebuild project included 460 new beds with complete operating rooms, emergency department, radiology, OB/GYNand cafeteria facilities supported by a new central plant service building.

As the General Contractor on this project, TEC’s responsibilities included the following:

Preconstruction Services

  • Site Investigation

  • Develop value engineering life-cycle cost for the design team

Make Ready Projects

Demolition of parking structures and buildings

Construction Phase

Construct medical office building and other smaller buildings

TEC also had the responsibility of maintaining hospital operations simultaneously during the construction phase of this project.